Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 125: 1996-040-00 EXP MID-C COHO O&M/M&E
Project Number:
Title:
Upper Columbia Production
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Methow 40.00%
Wenatchee 60.00%
Contract Number:
56662 REL 125
Contract Title:
1996-040-00 EXP MID-C COHO O&M/M&E
Contract Continuation:
Previous: Next:
56662 REL 93: 1996-040-00 EXP MID-C COHO O&M/M&E
Contract Status:
Closed
Contract Description:
This contract period from Feb. 1, 2017 through Jan. 31, 2018 would continue programmatic objectives for the coho reintroduction program.  Duties to include primary O&M activities such as acclimation, adult collections and spawning and early egg incubation in both the Methow and Wenatchee basins.  Other actions are included as well (e.g.- carcass outplanting, etc.) but are part of these overarching program goals and objectives.  M&E activities include survival measures and data collection for status and trend analyses of the coho program; both within year and for long-term comparisons.  Modifications to the 2017 calendar year of events is that the Methow program will begin to prepare for a transition to the NPIP phase, which will require approximately double the adult collections for spawning (for 1 M juvenile production for release in 2019). This was suppose to have happened in the previous contracting period but due to insufficient adult returns, increase will be delayed for the second straight year.  This had been originally scheduled for 2018 releases for Methow NPIP but with the delays of 8mile (SUP through USFS) and poor adult returns, YN had to make the determination to delay a year to maintain project integrity for all releases during NPIP to occur simultaneously.  The Wenatchee program continues to work through the BDPII phase of the program and will look to repeat project-specific studies to try and determine if a contingency can be implemented if adults are unable to ascend Tumwater Canyon at the rate required to meet BDPII objectives.
Account Type(s):
Expense
Contract Start Date:
02/01/2017
Contract End Date:
04/30/2018
Current Contract Value:
$1,358,749
Expenditures:
$1,358,749

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Rachel Castilleja Yakama Confederated Tribes No Administrative Contact casr@yakamafish-nsn.gov (509) 865-5121x6337
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Michelle Guay Bonneville Power Administration No Env. Compliance Lead mxguay@bpa.gov (503) 230-3459
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Cory Kamphaus Yakama Confederated Tribes Yes Contract Manager kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Technical Contact murk@yakamafish-nsn.gov (509) 548-2206
Thomas Scribner Yakama Confederated Tribes Yes Supervisor scrt@yakamafish-nsn.gov (503) 331-9850
Gregory Wolfe Yakama Confederated Tribes No Technical Contact wolg@yakamafish-nsn.gov (509) 881-0674


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain environmental compliance B: 165. Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction 01/31/2018 01/31/2018
Continue to develop operation plans and protocols C: 174. Hatchery Operations and Facility Plans 01/31/2018 01/31/2018
Conduct and document maintenance, repair and dredging activities D: 61. O&M for maintenance of facilities to include Rohlfing's Dredging 01/31/2018 01/31/2018
Manage and administer project, February 1, 2017 through January 31, 2018 E: 119. Manage and Administer 2017-2018 Project for Mid Columbia Coho Restoration 01/31/2018 01/31/2018
Acclimated smolts released F: 176. Acclimation/Release: Wenatchee: Beaver Creek pond (BY 2015) 06/30/2017 06/30/2017
Acclimated smolts released G: 176. Acclimation/Release: Wenatchee: Rohlfing's pond (BY 2015) 06/30/2017 06/30/2017
Acclimated smolts released H: 176. Acclimation/Release: Wenatchee: Butcher pond (BY 2015) 06/30/2017 06/30/2017
Acclimated smolts released I: 176. Acclimation/Release: Wenatchee: Leavenworth NFH (BY 2015) 04/30/2017 04/30/2017
Acclimated smolts released J: 176. Acclimation/Release: Methow: Wolf Creek Pond (BY 2015) 06/30/2017 06/30/2017
Acclimated smolts released K: 176. Acclimation/Release: Methow: Twisp Ponds (BY 2015) 06/30/2017 06/30/2017
Acclimated smolts released L: 176. Acclimation/Release: Methow: Winthrop NFH BC (BY 2015) 06/30/2017 06/30/2017
CWT or PBT mark fish BY2016 M: 158. Mark/Tag Animals - Subcontract CWT and/or PBT of approximately 1,500,000 BY16 coho pre-smolts 11/01/2017 12/11/2017
Collection of 2017 Coho Broodstock: Wenatchee and Methow programs N: 66. Trap 2017 broodstock at Dryden, Tumwater, Wells, Methow FH, Winthrop NFH, and LNFH 12/15/2017 12/11/2017
Spawn 2017 brood coho at Leavenworth NFH O: 176. Spawn 2017 brood coho at Leavenworth NFH 12/01/2017 12/05/2017
Spawn 2017 coho broodstock at Winthrop NFH P: 176. Spawn 2017 brood coho at Winthrop NFH 11/30/2017 11/27/2017
Carcass distribution for BY2017 broodstock Q: 44. Carcass dispersal of a portion of 2017 broodstock in the Wenatchee and Methow River programs 01/31/2018 01/31/2018
Transport 2017 BY eyed coho eggs to rearing facilities R: 66. Transport 2017 brood eyed-eggs from incubation facilities to rearing facilities 01/31/2018 01/21/2018
Coho redd counts and spawning composition for the 2017 return year S: 157. Conduct spawning ground surveys for the 2017 return year in the Wenatchee Basin 01/16/2018 01/16/2018
2017 return year coho redd counts and spawning composition T: 157. Conduct spawning ground surveys for the 2017 return year in the Methow Basin 01/16/2018 01/21/2018
Completed database U: 157. Collect biological data from 2017 coho brood at spawning 01/16/2018 01/21/2018
CWT recovery data from the 2017 BY V: 157. Extract CWT from 2017 brood coho snouts collected at spawning and on spawning ground surveys 01/31/2018 01/21/2018
PIT tag fish 2016 BY W: 158. Mark/Tag Animals - PIT-tag 58,000 BY16 coho pre-smolts 01/01/2018 01/01/2018
Analyze data from 2017 BY X: 162. Analyze and interpret M&E data from 2017 brood 12/01/2017 12/15/2017
Enter data Y: 160. Enter data into and maintain local databases 01/16/2018 01/16/2018
Collect data during 2017 emergence Z: 157. Collect/Generate Field and Lab Data to determine 2016 emergence timing, growth and distribution 01/31/2018 01/31/2018
Completed Annual Report AA: 132. Submit Annual Report for the FY16 period (2/1/16 to 1/31/17) 11/27/2017 12/15/2017
Tissue analysis by CRITFC for genetic monitoring AB: 157. Analyze genetic tissue samples for PBT analysis of parental groups 01/31/2018 01/31/2018
Finish 3-step process and proceed to construction AD: 196. Finish 3-step process for MCCRP 11/17/2017 11/10/2017
BY 2016 coho smolts transported AE: 66. Transport BY 2016 juveniles in 2018 05/31/2017 05/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 196 Council Step Process
  • 1 instance of WE 44 Enhance Nutrients in Water Bodies
  • 9 instances of WE 176 Produce Hatchery Fish
  • 3 instances of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2017
B 165 Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction 02/01/2017
C 174 Hatchery Operations and Facility Plans 02/01/2017
D 61 O&M for maintenance of facilities to include Rohlfing's Dredging 08/16/2017
E 119 Manage and Administer 2017-2018 Project for Mid Columbia Coho Restoration 02/01/2017
F 176 Acclimation/Release: Wenatchee: Beaver Creek pond (BY 2015) 02/01/2017
G 176 Acclimation/Release: Wenatchee: Rohlfing's pond (BY 2015) 02/01/2017
H 176 Acclimation/Release: Wenatchee: Butcher pond (BY 2015) 02/01/2017
I 176 Acclimation/Release: Wenatchee: Leavenworth NFH (BY 2015) 02/01/2017
J 176 Acclimation/Release: Methow: Wolf Creek Pond (BY 2015) 02/01/2017
K 176 Acclimation/Release: Methow: Twisp Ponds (BY 2015) 02/01/2017
L 176 Acclimation/Release: Methow: Winthrop NFH BC (BY 2015) 02/01/2017
M 158 Mark/Tag Animals - Subcontract CWT and/or PBT of approximately 1,500,000 BY16 coho pre-smolts 02/01/2017
N 66 Trap 2017 broodstock at Dryden, Tumwater, Wells, Methow FH, Winthrop NFH, and LNFH 02/01/2017
O 176 Spawn 2017 brood coho at Leavenworth NFH 02/01/2017
P 176 Spawn 2017 brood coho at Winthrop NFH 02/01/2017
Q 44 Carcass dispersal of a portion of 2017 broodstock in the Wenatchee and Methow River programs 02/01/2017
R 66 Transport 2017 brood eyed-eggs from incubation facilities to rearing facilities 02/01/2017
S 157 Conduct spawning ground surveys for the 2017 return year in the Wenatchee Basin 02/01/2017
T 157 Conduct spawning ground surveys for the 2017 return year in the Methow Basin 02/01/2017
U 157 Collect biological data from 2017 coho brood at spawning 02/01/2017
V 157 Extract CWT from 2017 brood coho snouts collected at spawning and on spawning ground surveys 02/01/2017
W 158 Mark/Tag Animals - PIT-tag 58,000 BY16 coho pre-smolts 02/01/2017
X 162 Analyze and interpret M&E data from 2017 brood 02/01/2017
Y 160 Enter data into and maintain local databases 02/01/2017
Z 157 Collect/Generate Field and Lab Data to determine 2016 emergence timing, growth and distribution 02/01/2017
AA 132 Submit Annual Report for the FY16 period (2/1/16 to 1/31/17) 02/01/2017
AB 157 Analyze genetic tissue samples for PBT analysis of parental groups 02/01/2017
AC 132 Begin preparation for annual reporting of the CY17 period (1/1/17 through 12/31/17) 02/01/2017
AD 196 Finish 3-step process for MCCRP
AE 66 Transport BY 2016 juveniles in 2018 02/01/2017